Products

Concrete & Cement Price List

For a custom quote for your project, contact us.

Allied Ready Mix Concrete 2016 Price List  

All concrete to meet CSA A23.1-04, Alternate #1.

28 Day Compressive StrengthMaximum Aggregate Size (mm)Slump (mm+/-20)Usage / LocationZone 1 Price per cubic meterZone 2 Price per cubic meter
Foundations
20 Mpa2080Miscellaneous$ 180.00$ 195.00
25 Mpa2080Footings$ 182.00$ 197.00
28 Mpa2080Foundation Walls$ 185.00$ 200.00
Interior Floors
25 Mpa2080Interior Floors$ 185.00$ 200.00
25 Mpa1480Interior Floors (line mix)$ 190.00$ 205.00
28 Mpa1480Interior Floors (line mix)$ 195.00$ 210.00
25 Mpa14130Radiant Topping*$ 195.00$ 210.00
28 Mpa14130Radiant Topping*$ 202.00$ 217.00
35 Mpa10700AllFlow SCC Self Compacting Concrete *$ 255.00$ 270.00
30Mpa14550EzFloor$ 235.00$ 250.00
* Prices for radiant & AllFlow Flowable topping mixes does not include HRWR and Fibers. Add $20.00 per m3.
Exterior Flatwork & Garage Floors
32 Mpa2080Exterior Flatwork$ 203.00$ 218.00
32 Mpa1480SuperLine Exterior Flatwork$ 211.00$ 226.00
BC building code requires 32 Mpa C-2 concrete for all exterior & garage slabs on grade.
Exterior Flatwork & Garage Floors
32 Mpa 2080Exterior Flatwork$ 203.00$218.00
32 Mpa1480Superline Exterior Flatwork$ 211.00$ 226.00
ConCreate Decorative Concrete
32 Mpa1080ConCreate Chilliwack Exposed$ 279.00$ 295.00
32 Mpa1480ConCreate Stamp Mix$ 221.00$ 236.00

All applicable taxes are extra.

Alternate 14mm Aggregate Premium (per cubic meter)$10.00
Environment Compliance Fee$9.00
Winter Handling (November through March)$9.00
Fuel Surcharge (per truck)$10.00

The above prices should be used for budget purposes only and actual pricing may vary. Please confirm pricing with sales prior to ordering concrete.

All sales are subject to Allied Ready Mix Concrete Limited's standard terms and conditions.

Allied Allcon Series Non-chloride AcceleratorsUnit Price
Allcon Bronze$8.00
Allcon Silver$16.00
Allcon Gold$24.00
Allied High Slump Concrete (mm)
110mm slump$6.00
130mm slump$9.00
150mm slump$12.00
170mm Slump$15.00
Allied Specialty Mixes
High Early Strength$30.00
KIM Krystol / Xypex waterproofing admixture$80.00
Integral Fibers$20.00
Rust Inhibitor (10L/m3) As per CSA S413$40.00
Allied AllFlow HRWR & VMA
 AllFlow HRWR (per dosage) $6.00
AllFlow VMA (Per litre)$12.00
AllFlow Fibres (per m3)$20.00
Allied Set Delay Retarders
SummerCon (per dosage)$9.00
SolarGuard Slump Retention$6.00
Delivery Costs
Night pours/off hour delivery-Contact Sales
Free unloading time - *8 minutes per cubic meter*
Standing Time (per hour in 15 minute increments) $135.00
Cancellation Fee (confirmed orders cancelled after 2:00 PM of the prior day or after drivers call out)$500.00
Overtime after 5pm (charged per man hour from 5pm until the truck returns to the yard) $90.00
Saturday deliveries (per cubic meter) $15.00
Return Concrete (charged per meter on returns in excess of 2 cubic meters) $30.00
Cartage Charges
0 - 1.9 Meters$300.00
2.0 - 2.9$200.00
3.0 - 3.9$175.00
4.0 - 4.9$160.00
5.0 - 5.9$150.00
6.0 - 6.9$140.00
No cartage except where two consecutive loads total less than 11.0 cubic meters.
Allied Concrete Pump Rates - Metro Vancouver (Vancouver, Burnaby, Richmond, etc.)
 Pump Rates

Minimum Charge Out

Rates (Hours)

Pump Meterage

(per cubic meter pumped)

Pump Environmental

Disposal Fee

Pump Washout Fee

(Based on one hour of hourly pump rate)

Line Pump$145.00/hr4 hours$4.00$150.00$145.00
High Pressure Line Pump$185.00/hr4 hours$4.00$150.00$185.00
24-32 Meter Boom$175.00/hr4 hours$4.00$150.00$175.00
36 Meter Boom$190.00/hr4 hours$4.00$150.00$190.00
38 Five-40 Meter Boom$210.00/hr4 hours$4.00$150.00$210.00
47-50 Meter Boom$265.00/hr5 hours$4.00$150.00$265.00
56-58 Meter Boom$325.00/hr5 hours$4.00$150.00$325.00
Allied Concrete Pump Rates - North Shore
 Pump Rates

Minimum Charge Out

Rates (Hours)

Pump Meterage

(per cubic meter pumped)

Pump Environmental

Disposal Fee

Pump Washout Fee

(Based on one hour of hourly pump rate)

Line Pump

$150.00/hr

4 hour minimum +1 hour travel time

$4.00$150.00$150.00
High Pressure Line Pump$185.00/hr

4 hour minimum +1 hour travel time 

$4.00$150.00$185.00
24-32 Meter Boom$185.00/hr

4 hour minimum +1 hour travel time

$4.00$150.00$185.00
36 Meter Boom$200.00/hr

4 hour minimum +1 hour travel time

$4.00$150.00$200.00
38 Five-40 Meter Boom$220.00/hr

4 hour minimum +1 hour travel time

$4.00$150.00$220.00
47 Meter Boom$275.00/hr

5 hour minimum +1 hour travel time

$4.00$150.00$275.00
56 Meter Boom$325.00/hr

5 hour minimum +1 hour travel time 

$4.00$150.00$325.00
58 Meter Boom$350.00/hr

6 hour minimum +1 hour travel time 

$4.00$150.00$350.00

Please Note:

Pump charges start from arrival onsite until departure from site. 30 minutes setup time is required for line pumps and boom sizes up to 40 meter, 60 minutes for boom sizes 47M+. Line pump jobs over 200’ as well as boom pump jobs needing line may require additional setup time and will be assessed on a case by case basis.

Off-site washout (if on-site washout is not available/possible): 60 minutes cleanout time at the applicable hourly pump rental rate plus $150 waste concrete/slurry disposal fee. Pump cleanout time is subject to applicable overtime charges. Alternatively, one time usage pump washout boxes can be provided at a cost of $125 each. Disposal of spent pump washout box and its contents is the responsibility of the pumping customer.

A second pump operator ($75 per hour, billed from yard-yard, 4 hour minimum, overtime applicable after 8 hours) will be required in the following situations:

  • line pump jobs requiring more than 150’of line. 
  • boom pump jobs requiring more than 100’ of line (more than 50’ of line for boom sizes 47M+).
  • when radio remote operation of the concrete pump is not possible or is deemed unsafe from the pour area.

Jobs over 150’ of line (100’ for boom pump sizes up to 40M, 50’ for boom sizes 47M+) in which the usage of a second operator has been declined will be subject to a $300 long-line charge.

Operator overtime charge of $75 per hour effective Monday-Friday: after 8 hours on site, all hours after 5:00PM, and all jobs starting (concrete arrival time) 3:00PM or later.

$50 per hour premium for Saturdays.

$300 line rental/delivery fee for line pump jobs requiring more than 250’ of line or boom pump jobs requiring more than 150’ of line.


$25 per hour premium for all shotcrete pours.


$300 dunnage rental/delivery fee for all job sites requiring additional dunnage or cribbing.


Jobs cancelled with less than 8 hours notice will be subject to a $300 cancellation fee. Jobs cancelled with less than 4 hours notice will be subject to the hourly minimum charge.


* All scheduling changes must be made between the hours of 5:30AM-5:30PM Monday to Friday